Client: Gateway Services CDD

Hole Montes designed roadway improvements at the existing Daniels – Gateway signalized intersection.  A dual eastbound left turn was added and lengthened along Daniels Pkwy. (CR 876) and a south bound right turn lane was added along Gateway Blvd.  Modifications to the existing signal and the existing drainage were completed as a result of the roadway enhancements.